MAJOR LAKE RAILROADS
Intra - Omegna, 20.776 km
gauge 1435 mm - electric 2000 V Ac, 21 Hz
9-oct-1910 open Pallanza - Fondotoce, km 7.393; SAVTE - Società Anonima Verbano per la Trazione Elettrica
30-jun-1913 open Fondotoce - Omegna, 10.052 km
18-apr-1929 open Pallanza - Intra, 2.976 km
18-oct-1946 closed; the track Omegna - Crusinallo has been used until 1982 as industrial connection
Stresa - Mottarone, 9.860 km
gauge 1000 mm - electric 750 V DC - cog wheel 6.958 km
12-jul-1911 - open by FSM - Ferrovia Stresa Mottarone
13-may-1963 closed and substitudted (1-aug-1970) by cable railway
Intra - Premeno, 13.341 km
gauge 1000 mm - electric 1350 V DC
28 -jun-1926 - open by FIP - Ferrovia - Intra Premeno
1-oct-1960 closed
Download:
MJL.zip 81 Kb new |
SAVTE - SOCIETA ANONIMA VERBANO TRAZIONE ELETRTRICA:
1 - 4 locked consist
1906, Milan's Exhibition for OPENING SIMPLON TUNNEL, temporary high railway, 2000 V AC 15 Hz, length 1350 m, 16 vehicles + 2 spare |
|||
SAVTE 1 - 12
1910, modifed bi-directional |
SAVTE 13 - 18
1926, trailer |
FSM - FERROVIA STRESA MOTTARONE:
FSM 1 - 5
1911 |
|||
FSM 11 - 13
1911, trailer |
FSM 21 - 24
1911, freight |
||
FSM x
1920, special for ski transport |
|||
FIP - FERROVIA INTRA PREMENO:
FIP 1 - 4
1926, brake with recovery of energy |
|||
FIP 11 - 12
1926, trailers |
|||
FIP G 1 - 2
1926, box car |
FIP P 1 - 2
1926, open car |
||